[previous] [back to main page] [next]


Appendix 5-G:
G7/8 Average Regression Results

From Chapter 5: Climate Change Control through G7/8, G20 and UN Leadership, by John Kirton and Ella Kokotsis
In Accountability for Effectiveness in Global Governance
edited by John Kirton and Marina Larionova
available from Routledge, 2018

  Estimate Std. Error t value Pr(>|t|)  Residuals:  
(Intercept) 0.454515 0.104183 4.363 5.34e−05***    
PP 0.014654 0.114761 0.128 0.8988  Min −0.85273
PPS −0.05922 0.255799 −0.231 0.8177  IQ −0.30754
TA −0.05746 0.509992 −0.113 0.9107  Median 0.01253
TS −0.07744 0.234559 −0.33 0.7425 3Q 0.30873
TM −0.14579 0.243115 −0.60 0.5511  Max 0.56198
RM −0.12452 0.443796 −0.281 0.78    
MM −0.08474 0.394319 −0.215 0.8306

 Min to Max Range

SA 0.732656 0.327414 2.238 0.0291*  1.41471  
CIO −0.04644 0.202938 −0.229 0.8198    
IL −0.00549 0.123593 −0.044 0.9647    
CS −0.45452 0.443796 −1.024 0.31    
PS −0.15938 0.24801 −0.643 0.523    
C_RS −0.9455 0.367882 −2.57 0.0128*    
Iteration 0.021359 0.048438 0.441 0.6609    
Official Level Body 0.064555 0.091985 0.702 0.4856    
SM NA NA NA NA    
IB NA NA NA NA    
OIO NA NA NA NA    
RO NA NA NA NA    
Min NA NA NA NA    
IOAR NA NA NA NA    
SUR NA NA NA NA    
IOS NA NA NA NA    
C O IO NA NA NA NA    
Total Catalysts NA NA NA NA    

Notes: Significance codes: 0 '***' 0.001 '**' 0.01 '*' 0.05 '.' 0.1 ' ' 1. Residual standard error: 0.4314 on 58 degrees of freedom. Multiple R-squared: 0.1736, Adjusted R-Squared: −0.04013. F-statistic: 0.8122 on 15 and 58 DF, p-value: 0.65.


[previous] [back to main page] [next]


[back to top]

G7 Research Group, G20 Research Group and BRICS Research Group
Trinity College in the University of Toronto
1 Devonshire Place, Room 209N
Toronto, ON M5S 3K7
Canada
This page was last updated August 15, 2024.